installation of Sewage treatment
plant for the EA field in progress.

Gas Switching Manifold Constructed
on the EA Riser Platform A.

Repair of LP Seperator Internal
For Sea Eagle FPSO.

Quick Release Coupler Replaced with a Rigid Spool Piece
On the Crude oil Export Line.

Construction of Fencing Panels
For Swamp Manifold on the NCTL Project.

Construction of Floating Dock and Ramp
on the BRT Project at Bonny Island.
For Daewoo/JGC/Mobil

PREV
NEXT

Fregald Provides Engineering, Procurement, and Construction Services, to the Oil and Gas Industry.

Company's concept is built around running a succesful frontline customer driven organisation.

FREGALD I.C.N LIMITED is a wholly owned Nigerian company duly incorporated in Nigeria in February, 2008 by the Corporate Affairs Commission, Garki Abuja with Registration number RC.733585.

FREGALD I.C.N Nigeria Limited is established with the prime objective of providing Engineering, Procurement & Construction Services to the Oil and Gas industry. Possessing a very strong technical and financial base predicated on sound management, we can mobilize promptly on any project within a short notice of receipt of letter of contract award.

Installation of 14 inches Gas line to NLNG and tunu CPF

Removal of Plant from Crate

Installation of repaired Internal
1.Adjustable Weir Plate
2.Anti-Surge Plate
3.Weir Anti-Surge Plate
4.Vane Pack Support And Dipe Pipe

Loading Of Fabricated Fencing Panel For Coating And Installation

3 x 1 Frog with a Stretcher to transport injured persons

Gas Switching Manifold

Installation of 4 inches Globe valve to carry out gas switching function

Installation Of Sewage Treatment Plant

Installing Plant To Skid

Repair Of LP Separator Internal

Installation of repaired Internal Inlet Diffuser and Cascade Tray

Construction of Fencing Panel for Swamp Manifold on the NCTL Project

Saipem / Shell Management Facility Inspection at the work-site

Construction of a floating Dock with a Ramp on the BRT Project at Bonny Island

Section of floating Dock and Ramp

Gas Switching Manifold

Torquing of 12inches Check valve and welding of pipes support in a pressurized habitat

Installation Of Sewage Treatment Plant

Installation of Plant / Skid on The FPSO

Repair Of LP Separator Internal

Inlet Diffuser and Cascade Tray

Upgrade of Liebherr crane for Man-Riding function

Liebherr crane certified to carryout Man-Riding function

Construction of a floating Dock with a Ramp on the BRT Project at Bonny Island

Forward end section of Floating Dock

OUR PARTNERS

TOP