
Installation of 14 inches Gas line to NLNG and tunu CPF

Removal of Plant from Crate

Installation of repaired Internal
1.Adjustable Weir Plate
2.Anti-Surge Plate
3.Weir Anti-Surge Plate
4.Vane Pack Support And Dipe Pipe

Loading Of Fabricated Fencing Panel For Coating And Installation

3 x 1 Frog with a Stretcher to transport injured persons

Installation of 4 inches Globe valve to carry out gas switching function

Installing Plant To Skid

Installation of repaired Internal Inlet Diffuser and Cascade Tray

Saipem / Shell Management Facility Inspection at the work-site

Section of floating Dock and Ramp

Torquing of 12inches Check valve and welding of pipes support in a pressurized habitat

Installation of Plant / Skid on The FPSO

Inlet Diffuser and Cascade Tray

Liebherr crane certified to carryout Man-Riding function

Forward end section of Floating Dock